PERFORMANCE INTRODUCTION

  1. No slotting is required;
  2. Complete joint cleaning, dehumidification and heating;
  3. The sealant is poured into the cracks of high temperature pavement under pressure;
  4. The quartz sand is covered by pressure to form a wearing course;
  5. Only 4 operators are required to complete the operation;
  6. The construction capacity is 3000-5000 M / D, which is 8-10 times of the slotting construction capacity